Awards Categories

Achievement AwardsGROUP

Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required. PLEASE NOTE - Photos may be resized to facilitate loading for judging.

PLEASE NOTE: projects will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

 

Criteria
  • Overall effectiveness of Marketing /Advertising material

    20%

  • Overall project appeal

    40%

  • Overall appeal of project features (parks, walking trails, etc)

    20%

  • Written submission

    20%

Print-friendly

Exterior and LandscapingGROUP

Requirements
  1. Submissions will be accepted only from Simcoe County Home Builder Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project)  PLEASE NOTE - Photos may be resized to facilitate loading for judging.
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan.  Hand drawn sketches are acceptable
  4. Written submission (maximum 300 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Criteria
  • Overall appeal: Design, materials

    50%

  • Environmentally Friendly Building Designs and Techniques: Use of material to enhance beauty and functionality of outdoor living space

    25%

  • Written submission

    25%

Print-friendly

Marketing and AdvertisingGROUP

Requirements
  1. Submissions will be accepted only from Simcoe County Home Builder Association Members in good standing
  2. Digital photos of Brochure or Print ad are required
  3. 1 Written submission (maximum 200 words) 

PREVIOUS ACE AWARD winning Print ads in this category are not eligible for entry in this category.

Criteria
  • Originality/creativity

    30%

  • General Design – Clarity of marketing theme: How well information and/or theme is conveyed to the buyer

    20%

  • Overall impact

    40%

  • Written Submission

    10%

Print-friendly
logo
Requirements
  1. Submissions will be accepted only from  Simcoe County Home Builders Association Members in good standing
  2. Web-site address / url included in submission
  3. Username and password for access to portals (where applicable)
  4. 1 – Written submission (maximum 200 words

PLEASE NOTE:  PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category.

Criteria
  • Overall originality and creativity

    40%

  • Concept and execution

    30%

  • Use of Simcoe County Home Builders' Logo

    10%

  • Written Submission

    20%

Print-friendly

New Home Design - Custom BuiltGROUP

Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required (1-3 in each of the following categories 300 dpi resolution):PLEASE NOTE - Photos may be resized to facilitate loading for judging.
    • Exterior
    • Interior
    • Kitchen
    • Master Bedroom
    • Ensuite/Main Bath
  3. Include a 8.5”x11” floor plan of the home with square footage (brochure inserts are acceptable)
  4. 1 –Written submission (maximum 300 words)

PLEASE NOTE: Homes will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although homes do not have not have to have been built within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Ensuite/Main Bath: Layout, Windows, overall appeal

    5%

  • Bedroom(s): Layout, Closet, Windows, overall appeal

    5%

  • Kitchen: Design, Storage, Traffic Flow

    5%

  • Functionality of floor plan

    25%

  • Overall exterior appeal: Selection of Colours, materials, window placement

    25%

  • Overall interior appeal: Design, materials

    25%

  • Written submission

    10%

Print-friendly
logo
Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required (1-3 in each of the following categories 300 dpi resolution):PLEASE NOTE - Photos may be resized to facilitate loading for judging.
    • Exterior
    • Interior
    • Kitchen
    • Master Bedroom
    • Ensuite/Main Bath
  3. Include a 8.5”x11” floor plan of the home with square footage (brochure inserts are acceptable)
  4. 1 –Written submission (maximum 300 words)

PLEASE NOTE: Homes will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although homes do not have not have to have been built within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Ensuite/Main Bath: Layout, Windows, overall appeal

    5%

  • Bedroom(s): Layout, Closet, Windows, overall appeal

    5%

  • Kitchen: Design, Storage, Traffic Flow

    5%

  • Functionality of floor plan

    25%

  • Overall exterior appeal: Selection of Colours, materials, window placement

    25%

  • Overall interior appeal: Design, materials

    25%

  • Written submission

    10%

Print-friendly

New Home Design - Production BuiltGROUP

Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required (1-3 in each of the following categories 300 dpi resolution):PLEASE NOTE - Photos may be resized to facilitate loading for judging.
    • Exterior
    • Interior
    • Kitchen
    • Master Bedroom
    • Ensuite/Main Bath
  3. Include a 8.5”x11” floor plan of the home with square footage (brochure inserts are acceptable)
  4. 1 –Written submission (maximum 300 words)

PLEASE NOTE: Homes will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although homes do not have not have to have been built within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Overall interior appeal: Design, materials

    25%

  • Overall exterior appeal: Selection of Colours, materials, window placement

    25%

  • Functionality of floor plan

    25%

  • Kitchen: Design, Storage, Traffic Flow

    5%

  • Bedroom(s): Layout, Closet, Windows, overall appeal

    5%

  • Ensuite/Main Bath: Layout, Windows, overall appeal

    5%

  • Written submission

    10%

Print-friendly
Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required (1-3 in each of the following categories 300 dpi resolution):PLEASE NOTE - Photos may be resized to facilitate loading for judging.
    • Exterior
    • Interior
    • Kitchen
    • Master Bedroom
    • Ensuite/Main Bath
  3. Include a 8.5”x11” floor plan of the home with square footage (brochure inserts are acceptable)
  4. 1 –Written submission (maximum 300 words)

PLEASE NOTE: Homes will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although homes do not have not have to have been built within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Ensuite/Main Bath: Layout, Windows, overall appeal

    5%

  • Bedroom(s): Layout, Closet, Windows, overall appeal

    5%

  • Kitchen: Design, Storage, Traffic Flow

    5%

  • Functionality of floor plan

    25%

  • Overall exterior appeal: Selection of Colours, materials, window placement

    25%

  • Overall interior appeal: Design, materials

    25%

  • Written submission

    10%

Print-friendly
Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required (1-3 in each of the following categories 300 dpi resolution):PLEASE NOTE - Photos may be resized to facilitate loading for judging.
    • Exterior
    • Interior
    • Kitchen
    • Master Bedroom
    • Ensuite/Main Bath
  3. Include a 8.5”x11” floor plan of the home with square footage (brochure inserts are acceptable)
  4. 1 –Written submission (maximum 300 words)

PLEASE NOTE: Homes will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although homes do not have not have to have been built within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Overall exterior appeal: Selection of Colours, materials, window placement

    25%

  • Overall interior appeal: Design, materials

    25%

  • Functionality of floor plan

    25%

  • Kitchen: Design, Storage, Traffic Flow

    5%

  • Bedroom(s): Layout, Closet, Windows, overall appeal

    5%

  • Ensuite/Main Bath: Layout, Windows, overall appeal

    5%

  • Written submission

    10%

Print-friendly

On Site Sales PresentationGROUP

logo
Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association members in good standing
  2. Digital photos are required. PLEASE NOTE - Photos may be resized to facilitate loading for judging

PLEASE NOTE: projects will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

 

Criteria
  • Overall interior appeal: Design, materials, overall appeal

    50%

  • Creative use of space: Uniqueness of Design

    40%

  • Written submission

    10%

Print-friendly

RenoMark - RenovatorsGROUP

logo
Requirements
  1. Submissions will be accepted only from Simcoe County Home Builders Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project)  PLEASE NOTE - Photos may be resized to facilitate loading for judging.
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan.  Hand drawn sketches are acceptable
  4. 1 – Printout of written submission (maximum 300 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although Projects do not have not have to have been renovated within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Overall appeal: Design, materials

    40%

  • Innovative Design and/or features: Design, Storage, Traffic Flow

    25%

  • Functionality of floor plan: Uniqueness of Design or innovation

    25%

  • Written submission

    10%

Print-friendly
logo
Requirements
  1. Submissions will be accepted only from  Simcoe County Home Builders Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project) PLEASE NOTE - Photos may be resized to facilitate loading for judging. 
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan or BEFORE  picture and AFTER picture of the Kitchen.  Hand drawn sketches of plans are acceptable 
  4. 1 – Printout of written submission (maximum 200 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although Kitchen projects do not have not have to have been renovated within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Written submission

    10%

  • Space Improvement written submission

    10%

  • Creative use of space/Functionality of floor plan: Uniqueness of Design or innovation

    20%

  • Innovative Design and/or features: Design, Storage, Traffic Flow

    20%

  • Overall appeal: Design, materials

    40%

Print-friendly
Requirements
  1. Submissions will be accepted only from  Simcoe County Home Builders Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project) PLEASE NOTE - Photos may be resized to facilitate loading for judging. 
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan or BEFORE  picture and AFTER picture of the Kitchen.  Hand drawn sketches of plans are acceptable 
  4. 1 – Printout of written submission (maximum 200 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although Kitchen projects do not have not have to have been renovated within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Overall appeal: Design, materials

    40%

  • Innovative Design and/or features: Design, Storage, Traffic Flow

    20%

  • Creative use of space/Functionality of floor plan: Uniqueness of Design or innovation

    20%

  • Written submission

    10%

  • Space Improvement written submission

    10%

Print-friendly
Requirements
  1. Submissions will be accepted only from  Simcoe County Home Builders Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project) PLEASE NOTE - Photos may be resized to facilitate loading for judging. 
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan or BEFORE  picture and AFTER picture of the Kitchen.  Hand drawn sketches of plans are acceptable 
  4. 1 – Printout of written submission (maximum 200 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although Kitchen projects do not have not have to have been renovated within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Written submission

    10%

  • Space Improvement written submission

    10%

  • Creative use of space/Functionality of floor plan: Uniqueness of Design or innovation

    20%

  • Innovative Design and/or features: Design, Storage, Traffic Flow

    20%

  • Overall appeal: Design, materials

    40%

Print-friendly
Requirements
  1. Submissions will be accepted only from  Simcoe County Home Builders Association Members in good standing
  2. Digital photos are required (Minimum of 4 pictures @ 300 dpi resolution showing before and after views of the project) PLEASE NOTE - Photos may be resized to facilitate loading for judging. 
  3. 1 – 8.5” x 11” BEFORE floor plan and AFTER floor plan or BEFORE  picture and AFTER picture of the Kitchen.  Hand drawn sketches of plans are acceptable 
  4. 1 – Printout of written submission (maximum 200 words)

PLEASE NOTE:  Renovations will be judged by photographs and online submissions only and these photos will also be used in the Awards Presentation. There will be no on-site judging.

Although Kitchen projects do not have not have to have been renovated within the past calendar year - PREVIOUS ACE AWARD winning projects in this category are not eligible for entry in this category

Criteria
  • Written submission

    10%

  • Space Improvement written submission

    10%

  • Creative use of space/Functionality of floor plan: Uniqueness of Design or innovation

    20%

  • Innovative Design and/or features: Design, Storage, Traffic Flow

    20%

  • Overall appeal: Design, materials

    40%

Print-friendly

Top Member AwardsGROUP

Requirements

Description of Member/ Individual ( Explain in what ways you contribute to the Association and the community)

1-5 photographs  of yourself or company involved in Association projects/events etc.

 

Criteria
  • Contribution to the Community

    40%

  • Contribution to the Association

    50%

  • Quality of service

    10%

Print-friendly
Powered by Awardify